When we moved in our house had essentially two full bathrooms, although the one in the basement was icky and we decided that we didn't need to us it until it was redone. The tentative plan was to redo the basement bathroom before demoing the main bathroom so that we wouldn't be without a functional bathroom. A few months after moving in we have essentially one half bath on our way to having 2.5 baths. We're using the toilet and shower in the basement, sink in the kitchen, we have a framed in half bath with rough in plumbing and a demo'd main bath that can't be used for any normal bathroom activities.
Here are some photos of the main bath:
Before: